Our Work

NPE Equipment Yard

NPE Equipment Yard Houston Install 8″ GS-100 on lime stabilized sub-grade on front acre. Prepare 2 acre sub-grade in the back and install 14″ of GS-100. Customer NPE Services Subgrade
Read More

Tech Fab

Tech Fab Dig out 12″ of dirt and relocate on site, lime stabilize 6″ at 6% and install 12″ GS-100. Dig drainage canal and create mid retention pond for new
Read More

Port Rd

Port Rd Resurface 3 acres with 12″ GS-100 Fill in 2 acre retention pond with dirt excavated from existing ponds. Install 18″ GS-100 on 2 acre site. Customer C/PA Services
Read More